When is a change a change?
Posted by Mark in Build Management, Change Management, Configuration Management, Plain Old Blog, Software Configuration Management, Version Control on June 12, 2010
A change can be viewed in two ways; conceptually or literally. What I mean by this distinction is that when I say the requested change is to “correct spelling mistakes in the poem” I am specifying conceptually what the change is to achieve (and after the fact, what the change achieved). On the other hand [...]